LGG Industrial was able to use a Goodall chemical hose with stainless steel adaptors to replace a failing metal hose that would take too long to fabricate and ship. This quick substitution reduced downtime and product loss, saving the customer $1,012.
LGG Industrial quick action during a conveyor belt survey prevented possible damage to the belt and saved the customer $48,406 in avoided downtime.
By training maintenance personnel in the use of their products, LGG Industrial was able to save the customer $71,400 in reduced maintenance and downtime.