Search

LGG Industrial emergency deliveries saved the mill an estimated $10,000 in downtime.

LGG Industrial emergency response saved the steel plant three hours of lost production time, resulting in $75,000 in savings to the customer.

By repairing the belt instead of replacing it, LGG Industrial was able to save the customer $88,081 and avoid a possible shutdown.

LGG Industrial was able to reduce the plant’s skirt board change outs resulting in an annual savings of $360,000.

By developing a welded argon tube, the mill has reduced leaks and increased product quality, saving $200,000 per year.

The new expansion joint design will last four times longer and save the customer $47,293.

LGG Industrial was able to deliver a hose that normally takes four to five weeks in four days, saving the plant downtime that costs $432,000 per day.

LGG Industrial prevented the plant from replacing the belt and avoided downtime, saving them $568,000.