LGG Industrial was on site during the customer’s outage, saving them $16,250 in reduced labor and excess inventory.
LGG Industrial reduced the customer’s downtime by working overtime to produce a gasket that saved the mill $400,000.
Replacing their current packing with the hollow core packing enabled the customer to achieve a three-year life between changes. The total cost savings is estimated at $50,938.
LGG Industrial was able to make an emergency repair on Christmas Eve, saving the customer both in labor and in downtime for a total savings of $57,000.