Search

LGG Industrial was able to deliver a hose that normally takes four to five weeks in four days, saving the plant downtime that costs $432,000 per day.

LGG Industrial prevented the plant from replacing the belt and avoided downtime, saving them $568,000.

LGG Industrial was able to make an emergency repair on Christmas Eve, saving the customer both in labor and in downtime for a total savings of $57,000.

LGG Industrial quick action during a conveyor belt survey prevented possible damage to the belt and saved the customer $48,406 in avoided downtime.

By training maintenance personnel in the use of their products, LGG Industrial was able to save the customer $71,400 in reduced maintenance and downtime.