LGG Industrial safety inspection helped prevent a potentially catastrophic accident from occurring, saving the customer $78,410.

LGG Industrial was on site during the customer’s outage, saving them $16,250 in reduced labor and excess inventory.

LGG Industrial reduced the customer’s downtime by working overtime to produce a gasket that saved the mill $400,000.

Replacing their current packing with the hollow core packing enabled the customer to achieve a three-year life between changes. The total cost savings is estimated at $50,938.

LGG Industrial was able to make an emergency repair on Christmas Eve, saving the customer both in labor and in downtime for a total savings of $57,000.

LGG Industrial product substitution has resulted in the expansion joints having triple the life expectancy and has reduced downtime. This has saved the customer $123,100 to date.

By changing the customer’s belt from a two-ply to three-ply, the belt ran straight, reduced product spillage and downtime for a savings of $12,500.

LGG Industrial was able to repair a leaking gasket rather than replace it, saving the customer $32,700 in reduced downtime and repair costs.

By completing the hose survey, LGG Industrial saved the customer $18,000 in labor costs versus completing this survey themselves.

By installing automatic lubricators, LGG Industrial saved the customer $108,000 annually in labor costs and eliminated a potential safety hazard for workers.