LGG Industrial was able to use a Goodall chemical hose with stainless steel adaptors to replace a failing metal hose that would take too long to fabricate and ship. This quick substitution reduced downtime and product loss, saving the customer $1,012.
LGG Industrial quick action during a conveyor belt survey prevented possible damage to the belt and saved the customer $48,406 in avoided downtime.
By training maintenance personnel in the use of their products, LGG Industrial was able to save the customer $71,400 in reduced maintenance and downtime.
Due to LGG Industrial conveyor belt surveys and repairs, the customer began to see a drop in their downtime and emergency failures, resulting in a savings of $1.39 million.
LGG Industrial developed a custom stainless steel chemical union that resulted in reduced installation time and increased product life. This has saved the customer a total of $221,072 so far.
By installing a different type of belt, LGG Industrial increased the plant’s production and reduced cleanup costs. This has saved the company over $1 million annually.
LGG Industrial vendor inventory management program has saved the customer $18,080 annually by reducing inventory and avoiding freight charges.
LGG Industrial suggested changes that caused the belt to run smoother around the pulley, which decreased downtime and maintenance costs. The total savings is estimated at $151,149 annually.
LGG Industrial started managing and maintaining inventory levels, saving the customer an estimated $200,000 in unnecessary purchases.
LGG Industrial provided superior products and services that reduced downtime, and created an annual impact of $76,200.