LGG Industrial is helping customers get ahead of the near deadlines to comply with Respirable Crystalline Silica (RCS) dust exposure.

LGG Industrial loading arms survey and equipment upgrades helped a customer avoid a potential $500,000 in downtime expenses.

LGG Industrial was able to recommend new belting materials for applications that were prematurely failing, saving over $6M in reduced downtime, installation costs, and replacement costs.

By working 24/7, LGG Industrial was able to save the plant 24 hours of downtime which would have cost $64,800 in lost production.

By substituting a more durable belt than what the customer was using, LGG Industrial was able to reduce the number of belts used in a year by 102, saving the customer $397,302.

By recommending an alternative product, LGG Industrial was able to reduce the number of belts used by 64, saving the customer $21,504 over eight months.

By recommending a new splicing technique, LGG Industrial was able to reduce the number of belts used in a year by 24, saving the customer $38,400 annually.

LGG Industrial emergency deliveries saved the mill an estimated $10,000 in downtime.

LGG Industrial emergency response saved the steel plant three hours of lost production time, resulting in $75,000 in savings to the customer.

By repairing the belt instead of replacing it, LGG Industrial was able to save the customer $88,081 and avoid a possible shutdown.