LGG Industrial was able to reduce the plant’s skirt board change outs resulting in an annual savings of $360,000.

By developing a welded argon tube, the mill has reduced leaks and increased product quality, saving $200,000 per year.

The new expansion joint design will last four times longer and save the customer $47,293.

LGG Industrial was able to deliver a hose that normally takes four to five weeks in four days, saving the plant downtime that costs $432,000 per day.

LGG Industrial prevented the plant from replacing the belt and avoided downtime, saving them $568,000.

LGG Industrial’s steam hose recommendations, including the switch to Goodall’s crimped 20:1 Super Inferno hose, improved the customers hose management program, saving them $230,205 over 5 years.

By reclaiming hoses, LGG Industrial has repaired 150 hoses and saved the refinery $15,925.

By finding an alternative to the customer’s HDPE pipe connections, LGG Industrial increased safety and efficiency while reducing costs by $92,500 annually.

LGG Industrial was able to develop a specification as an alternative to the plant’s field welded pipe, delivering the customer a savings of $5.5 million.

LGG Industrial gasket solution saved the customer time, lost product and cleanup costs. The savings totaled $12,756.