By changing out the expansion joints, LGG Industrial reduced the downtime needed to change out the joint and reduced costly cleanup, saving the customer an estimated $5,950.
LGG Industrial sourced conveyor belts that were manufactured near the customer and delivered direct to save the customer $9,000 in freight and equipment savings.
LGG Industrial was able to provide safety training to the customer, which saved $1,500 that they would have needed to pay for outside training.
LGG Industrial hose survey resulted in a new hose assembly for the customer that is not only more efficient, but also safer. This change has resulted in a savings of approximately $53,539 annually.
LGG Industrial VMI defends against wasted time and transaction costs, causing the customer to save a minimum of $15,600 annually.
By testing and reclaiming hoses, LGG Industrial was able to save the customer $87,975 they would have otherwise spent on replacing these hoses.
LGG Industrial saved the customer $318,450 by reclaiming 579 hoses that would have otherwise been replaced.
LGG Industrial upgraded the diaphragms, which dramatically reduced plant downtime and maintenance costs for a total savings of $17,528.
By designing a new gasket to fit the flange, LGG Industrial was able to save the customer $300,000 annually.
LGG Industrial hose management program was able to put 122 hose assemblies back into service saving the customer $96,950 in the first year.